Concerns about a bridge's quality were raised on social media. An inspection was conducted to address these concerns. A delegation, led by a director, assessed the project and found it met engineering standards. The allegations of structural failure were found to be unsubstantiated.

The inspection was a response to reports of defects. The project was evaluated and found to be sound.

Further details about the assessment are available from the source, including the results of integrity tests and the inspection process.